HPP Name: MVEC Sborishte 
 Operator/Company: Hidro In OOD 
 River: r.Dolap dere 
 Water body: Tundzha 
 City / Village: s.Sborishte 
 HPP Municipality: Tvyrdica 
 HPP nearby City / Village: s. Sborishte 
 Power (KW) acc. to RBD: 450 
 Weir altitude: 710.00 
 Weir coordinates (decimal): 42.705684,25.965494 
 Min. ecological flow (l/sec): 14 
 Fish pass available: f 
 Fish pass type:  

 Attached files:
file namesize (bytes)last modifiedMIME type
total 0 files


Page last modified on 17.10.2017 18:26